total engineering center area
From development and testing to preparation for serial production inside one engineering loop.
Opportunity to become a co-owner
Sovelmash is building an engineering and production center for developing and manufacturing energy-efficient asynchronous motors with combined windings. This is not a promise of profit, but a window for studying a rare technology stake at an early stage.
20 Jun 2026
Forbes / special project / 12.10.2022Innovation for industryForbes wrote about Sovelmash moving from lab work and prototypes toward an engineering center and a new type of electric motor.From development and testing to preparation for serial production inside one engineering loop.
High localization, its own engineering school and a full production cycle.
The company is developing not only motors, but also the infrastructure needed to manufacture them.
Focus on motors that help reduce energy consumption where the load is constant.
Why this niche can be highly profitable
Electric motors are in industry, transport, ventilation, elevators, machines and tools. If a technology reduces energy losses and improves service life, a business gets not a pretty presentation, but savings in operating costs.
pumps, machines, conveyors, ventilation
elevators, transport, drives, utility systems
lower energy losses under long operating loads
preparation of Sovelmash-branded angle grinders


















Why now
Here it is better to look not at promises, but at concrete signs of movement:
on 17 September 2025, Moscow construction supervision issued a ZOS document for the Sovelmash facility;
the engineering center area is listed in documents at about 14,408-14,700 m2, depending on the source wording;
the project states that it is preparing its own Sovelmash-branded angle grinders and accepting business requests for engineering development.
What this means for a cautious person:
open the personal account;
check the documents, terms and risks;
ask questions before making a decision, not after.
This is not a reason to rush. It is a reason to calmly study the project while it approaches the production phase.
Layer of trust
On 17 September 2025, Moscow construction supervision issued a ZOS document for the Sovelmash facility.
The total facility area in documents is about 14,408-14,700 m2, depending on the source wording.
The SEZ resident status and the Alabushevo land plot are backed by project documents.
There is a developer code, technical specifications, a trademark and part of the audit reports.
The construction photo archive shows the physical history of the facility, not only presentations.
Global layer
At home, in elevators, ventilation, factories, pumping stations, transport and the agricultural sector. Asynchronous and other electric motors work as the hidden muscle of the world economy.
of all electricity in 2023 was used by electric motor systems.
Source: IEA 4E EMSAHonest filter
The site materials are not an investment recommendation and do not promise returns. Statements about readiness, orders, the product line and prospects should be checked against documents, the personal account and support after registration. A strong project is not afraid of scrutiny.
Next step
Registration gives you access to materials, terms, packages, support and more details. It does not force you to invest.
The personal account contains documents, terms, packages, installments and current project materials. Registration does not force an investment: first study the facts, ask questions and make a decision only when the terms are clear.